Latest news from Heavy Lift & Project Forwarding International Magazine

An Indonesian first for Kaleido

Kaleido Logistics has handled the delivery of wind turbine components for Indonesia’s first wind farm located in the South Sulawesi region. 


Kaleido was responsible for the ocean transport from China to Indonesia, as well as arranging floating cranes, stevedoring services and the inland transportation.

In one phase of the project, Kaleido used specialist barges to transport 90 tower sections from Ciwandan to Parepare Port in Indonesia. 

In addition to the design and optimisation of the storage yard, Kaleido handled the transhipment of 90 wind turbine blades in Parepare Port as well as the road transport to site.

Kaleido, member of the Worldwide Project Consortium (WWPC) in Spain, was also responsible for the road transport of the nacelles and hubs of 30 wind turbine generators.

 

www.kaleidologistics.com 

www.wwpc.eu.com

Heavy Lift | News

AET places Kalmar order thumbnail image

AET places Kalmar order

June 14 - Antwerp Euroterminal (AET) has placed an order for six Kalmar forklifts, including a fully electric model. 
Views: 329
Multipurpose charter rates remain stable thumbnail image

Multipurpose charter rates remain stable

June 14 - Time charter rates in the multipurpose shipping sector have remained stable over the last month, according to the latest data from shipbroker Toepfer Transport.
Views: 434
Buss launches JV with Idea thumbnail image

Buss launches JV with Idea

June 14 - Hamburg-based Buss Offshore Solutions and French logistics provider Idea established a joint venture that will serve the offshore market in France.
Views: 408

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.