Latest news from Heavy Lift & Project Forwarding International Magazine

Barrus supports Vestas assembly

Barrus Projects has moved wind turbine equipment at Vestas’ production facility in Dzerzhinsk, Russia.

Located in a Liebherr production terminal in the Nizhny Novgorod Oblast region of Russia, Vestas’ facility is used for the assembly of nacelles weighing up to 72 tonnes and measuring 12.73 m x 4.17 m x 3.18 m.

Barrus Projects was responsible for the in-plant relocation of the nacelles. All transport operations were completed using the company’s fleet of Goldhofer PST/SL modules, equipped with power pack units. 

www.barrusprojects.com 

Heavy Lift | News

Meyer steps down from Zeaborn thumbnail image

Meyer steps down from Zeaborn

July 18 - Ove Meyer, co-founder of Zeaborn has resigned as managing director, including his role at Zeamarine.
Views: 392
Bishop takes AWRS thumbnail image

Bishop takes AWRS

July 18 - Bishop Lifting Products has completed the acquisition of American Wire Rope & Sling (AWRS), a leading provider of rigging, lifting and overhead crane solutions.
Views: 274
Centauro crosses the Andes thumbnail image

Centauro crosses the Andes

July 18 - Centauro Argentina has coordinated the delivery of turbines for a hydroelectric energy project in Mendoza.
Views: 287

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.