Latest news from Heavy Lift & Project Forwarding International Magazine

Overcoming low water levels with Dan-Czech

Dan-Czech Specialtransport has handled the delivery of a 110-tonne turbine from the Siemens factory in Görlitz, Germany to Avonmouth, UK.

As a result of low water levels on the river Elbe, the turbine had to be transported via Nuremberg. According to Dan-Czech, the turbines would usually be transported via Dresden or Aken.

From Nuremberg the turbine was transported to Rotterdam by barge, where it was loaded onto a vessel for onward transportation to Avonmouth.

For the road transport from the factory to the loading dock in Nuremberg, the combination measured 26.5 m x 4.7 m x 5.25 m and weighed 163.4 tonnes, excluding the push truck.

In total, it took three weeks to transport the equipment from Görlitz to its final destination.

dan-czech.cz

Heavy Lift | News

Collett delivers footbridge thumbnail image

Collett delivers footbridge

July 19 - Collett & Sons has delivered six over-dimensional bridge components to Worcester in the UK.
Views: 317
Sims Crane appoints Lester thumbnail image

Sims Crane appoints Lester

July 19 - Florida’s Sims Crane & Equipment has named Jared Lester as its business development manager. 
Views: 401
ITI and FHS to open Florida training centre thumbnail image

ITI and FHS to open Florida training centre

July 19 - Florida Handling Systems (FHS), a Mazzella Company, and Industrial Training International (ITI) have confirmed that they will develop a training centre in Bartow, Florida.
Views: 428

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.