Latest news from Heavy Lift & Project Forwarding International Magazine

Sarens loads out in Wallsend

Sarens has loaded out a 580-tonne pile template in Wallsend, UK on behalf of Van Oord.

Van Oord is responsible for installing 102 three-legged jacket foundations for Scottish Power Renewables (part of the Iberdrola Group), which is building the East Anglia ONE offshore wind farm in the North Sea.

To transport the offshore structure, which had a diameter of 38 m, Sarens utilised link spans measuring 21 m in length.

While most of the equipment used for the load-out, including SPMTs and mobile cranes, arrived at the project site from the UK, the link spans were delivered from the Netherlands.

During the load-out operation, Sarens had to line up the pile template with the link span design before driving the structure on to a barge for onward transportation.

www.sarens.com

www.vanoord.com

Heavy Lift | News

Crowley realigns activities thumbnail image

Crowley realigns activities

May 17 - Crowley Maritime Corporation has realigned its shipping and solutions business units in a bid to enhance its focus on non-asset based customer solutions.
Views: 396
Bob Felix joins UTC thumbnail image

Bob Felix joins UTC

May 17 - UTC Overseas has appointed Bob Felix to its rail logistics team as director of specialised projects.
Views: 608
Mammoet expands in Westdorpe thumbnail image

Mammoet expands in Westdorpe

May 17 - Mammoet has expanded its Westdorpe facility in the Netherlands to include onsite maintenance facilities.
Views: 369

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.