Latest news from Heavy Lift & Project Forwarding International Magazine

Turbines get a lift with Cortland

Cortland, a designer and manufacturer of synthetic rope slings, has supplied lifting and rigging equipment for the Norther offshore wind farm, which is being built 23 km off the coast of Ostend, Belgium.

Photo credit: Norther

Synthetic rope slings from Cortland will support the lifting of monopiles, transition pieces and turbines. When completed, the wind farm will feature 44, 8.4 MW turbines.

The equipment supplied includes seven Selantic slings ranging in size from 20 m up to 60 m, featuring capacities up to 2,500 tonnes, as well as three Plasma grommet slings.

Cortland’s European sales leader, Wilco van Zonneveld, said: “Synthetics are currently being used on wind farms at North Sea sites in Belgium, the Netherlands, Germany and the UK. Reducing risk during lifting operations is a critical priority across industries, including construction, oil and gas and renewables.”

www.cortlandcompany.com

Heavy Lift | News

Volga-Dnepr to expand at Leipzig thumbnail image

Volga-Dnepr to expand at Leipzig

June 19 - Volga-Dnepr Group and Mitteldeutsche Flughafen (MFAG) have signed a memorandum of understanding (MoU) to expand their partnership at Leipzig/Halle Airport in Germany.
Views: 269
Jan De Nul lands Formosa 2 contract thumbnail image

Jan De Nul lands Formosa 2 contract

June 19 - Jan De Nul Group has been awarded an engineering, procurement, construction and installation (EPCI) contract for Taiwan’s Formosa 2 offshore wind farm.
Views: 238

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.