Latest news from Heavy Lift & Project Forwarding International Magazine

Coordinadora lands Windfloat project

Spain-headquartered Coordinadora has been selected to complete logistics works for Navantia’s Windfloat Atlantic project.

Coordinadora will complete transport engineering, load out, dry towage and float off operations for the floating offshore wind turbine project.

In the summer of 2019, a Windfloat unit is scheduled for delivery to Fene Shipyard in La Coruña, Spain. Coordinadora will use SPMTs to roll the unit from the manufacturing yard up to the loading wharf. The company will load out the unit onto a semi-submersible barge, which will be towed to safe and sheltered waters before the Windfloat unit is discharged.

Windfloat has been designed and patented by Principle Power. This type of foundation enables wind turbines to be built in previously inaccessible locations where water depth exceeds 40 m.

www.coordinadoraetm.com

www.principlepowerinc.com

Heavy Lift | News

GALA completes TAP scope thumbnail image

GALA completes TAP scope

June 17 - German Albanian Logistics Agency (GALA) has unloaded and stored 2,800 tons (2,540 tonnes) of sheet piles for the Trans Adriatic Pipeline (TAP).
Views: 237
Mammoet moves for Sergipe project thumbnail image

Mammoet moves for Sergipe project

June 17 - Mammoet has teamed up with Fracht to transport oversized cargo for the Usina Termoelétrica Porto de Sergipe combined-cycle power plant in Brazil.
Views: 227
ALS moves in Hull thumbnail image

ALS moves in Hull

June 14 - UK-headquartered Abnormal Load Services (ALS) is relocating to larger premises in Hull.
Views: 584
Seville ships Haliade towers thumbnail image

Seville ships Haliade towers

June 14 - Tower sections that will make up General Electric’s (GE) Haliade-X offshore wind turbine have been loaded onto the multipurpose vessel Palmerton at the port of Sevilla, Spain.
Views: 616

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.