Latest news from Heavy Lift & Project Forwarding International Magazine

DAKO delivers North Stream boilers

DAKO Worldwide Transport coordinated the delivery of four boilers destined for the North Stream pipeline project.

The boilers were shipped from their manufacturing site in Bavaria to Lumbin in northeastern Germany.

The boilers, which measured more than 5 m in height, were trucked to the port of Roth before being loaded onto barges for the journey to Lumbin.

www.dakoworld.com

 

Heavy Lift | News

Superior bridge service with Imperial thumbnail image

Superior bridge service with Imperial

May 22 - Imperial Crane Services and Superior Construction have utilised a Liebherr LR1300 SX crawler crane to lift six concrete beams for the Chase Street bridge replacement project in California, USA.
Views: 253
EGL in transformer move thumbnail image

EGL in transformer move

May 21 - Egyptian Global Logistics (EGL) has unloaded and transported two transformers destined for a power station at Damietta Furniture City.
Views: 296
Marr towers ahead in Sydney Metro project thumbnail image

Marr towers ahead in Sydney Metro project

May 20 - At the end of 2018, Austrlian heavy lifting specialist Marr Contracting utilised two tower cranes to complete a key phase of the Sydney Metro infrastructure project.
Views: 468
From Antwerp to Açu thumbnail image

From Antwerp to Açu

May 17 - Earlier this month, BBC Amethyst anchored in Porto do Açu, making it the first vessel to cross from Antwerp to the Brazilian seaport.
Views: 811

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.