Latest news from Heavy Lift & Project Forwarding International Magazine

Fesco steams ahead

Fesco Transportation Group has delivered oversized equipment, with a total weight of almost 4,000 tons (3,628.7 tonnes), to the Afipsky oil refinery in Krasnodar, Russia.

Steam reforming equipment was transported across five shipments from the port of Constanta in Romania to the port of Novorossiysk. The heaviest unit weighed 160 tons (145 tonnes) and measured 25 m x 5 m x 4 m.

According to Fesco the loading and sea fastening operations in Constanta lasted approximately three days per unit, while the sea crossing to Novorossiysk took two days. 

The cargoes were stored at the Russian port before they were delivered to the refinery by road. 

www.fesco.ru

Heavy Lift | News

Weiland lifts with Liebherr thumbnail image

Weiland lifts with Liebherr

February 18 - German crane contractor Weiland has used its Liebherr LTM 1450-8.1 to lift and remove a smaller five-axle mobile crane from the Heidingsfeld viaduct in Würzburg.
Views: 195
Exploration back in the black thumbnail image

Exploration back in the black

February 18 - After a difficult few years, the oil and gas exploration sector is back in the black, according to analysis from Wood Mackenzie.
Views: 159
Record unit at Bilbao thumbnail image

Record unit at Bilbao

February 15 - The port of Bilbao, Spain, has loaded its heaviest-ever cargo: a 2,450-ton (2,223-tonne) ship-to-shore (STS) crane.
Views: 963
V&M chooses Terex for Ultimate project thumbnail image

V&M chooses Terex for Ultimate project

February 15 - V&M Erectors has been busy on the the largest infrastructure project in the Florida Department of Transportation’s (FDOT) history.
Views: 818

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.