Latest news from Heavy Lift & Project Forwarding International Magazine

Floating docks arrive in Curaçao

Cosco Heavy Transport's semi-submersible vessel Xin Guang Hua has delivered two floating docks to Damen Shiprepair Curaçao (DSCu) in the southern Caribbean.

The larger of the two floating docks - a Panamax-Class dock measuring 230 m by 45 m - will be used for tankers, containerships and other large vessels. The smaller unit measures 108 m by 23 m.

The docks arrived at the port of Willemstad in Curaçao. DSCu has begun works on the internal compartments of the docks to make them ready for operations. Onshore and offshore works are well under way in order to bring the floating docks into service.

 



www.damenshiprepair.com

coscoht.com
 

Heavy Lift | News

Record unit at Bilbao thumbnail image

Record unit at Bilbao

February 15 - The port of Bilbao, Spain, has loaded its heaviest-ever cargo: a 2,450-ton (2,223-tonne) ship-to-shore (STS) crane.
Views: 408
V&M chooses Terex for Ultimate project thumbnail image

V&M chooses Terex for Ultimate project

February 15 - V&M Erectors has been busy on the the largest infrastructure project in the Florida Department of Transportation’s (FDOT) history.
Views: 381
Höegh’s ro-ro solution to Dammam thumbnail image

Höegh’s ro-ro solution to Dammam

February 14 - Höegh Autoliners has delivered a 112-tonne transformer, manufactured by CG, from Antwerp to Dammam in Saudi Arabia, on behalf of Kintetsu World Express (KWE).
Views: 423

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.