Latest news from Heavy Lift & Project Forwarding International Magazine

Jackets installed at East Anglia One

The first of two jacket foundations have been successfully installed at the East Anglia One wind farm, located off the coast of Suffolk, UK.

Source - Van Oord

 

Offshore contractor Van Oord transported the first foundation to the project site using its heavy lift vessel Bokalift One. The jackets were successful installed using a bespoke jacket lifting tool designed by Temporary Works Design (TWD).

Weighing just over 25 tonnes and with a lifting capacity of over 1,000 tonnes, the lifting tool was able to speed up the installation by lifting the 60 m-high jackets into place.

The remote-controlled jacket lifting tool is also adaptable to different flange diameters, which makes it suitable for use on future installation projects, said TWD.

www.vanoord.com

www.twd-uk.com

Heavy Lift | News

Neeb builds bridges with Terex thumbnail image

Neeb builds bridges with Terex

January 17 - Neeb Crane has used a 500-tonne capacity Demag AC 500-8 all-terrain cranefor a bridge expansion project over the A1 freeway near Cologne, Germany.
Views: 226
SAL delivers multi-load thumbnail image

SAL delivers multi-load

January 17 - SAL Heavy Lift has transported multiple vessels from the port of Genoa Italy to Jebel Ali, UAE.
Views: 278
ALE returns to Texas topside thumbnail image

ALE returns to Texas topside

January 16 - ALE has placed the second of three modules on top of an offshore topside in Texas, USA.
Views: 474
STS crane loaded at Bilbao thumbnail image

STS crane loaded at Bilbao

January 16 - Grupo Altius has coordinated the loading of a fully erected ship-to-shore (STS) crane at the port of Bilbao, Spain in cooperation with MarĂ­tima Davila and Toro y Betolaza.
Views: 399

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.