Latest news from Heavy Lift & Project Forwarding International Magazine

Overcoming low water levels with Dan-Czech

Dan-Czech Specialtransport has handled the delivery of a 110-tonne turbine from the Siemens factory in Görlitz, Germany to Avonmouth, UK.

As a result of low water levels on the river Elbe, the turbine had to be transported via Nuremberg. According to Dan-Czech, the turbines would usually be transported via Dresden or Aken.

From Nuremberg the turbine was transported to Rotterdam by barge, where it was loaded onto a vessel for onward transportation to Avonmouth.

For the road transport from the factory to the loading dock in Nuremberg, the combination measured 26.5 m x 4.7 m x 5.25 m and weighed 163.4 tonnes, excluding the push truck.

In total, it took three weeks to transport the equipment from Görlitz to its final destination.

dan-czech.cz

Heavy Lift | News

Neeb builds bridges with Terex thumbnail image

Neeb builds bridges with Terex

January 17 - Neeb Crane has used a 500-tonne capacity Demag AC 500-8 all-terrain cranefor a bridge expansion project over the A1 freeway near Cologne, Germany.
Views: 643
SAL delivers multi-load thumbnail image

SAL delivers multi-load

January 17 - SAL Heavy Lift has transported multiple vessels from the port of Genoa Italy to Jebel Ali, UAE.
Views: 650
ALE returns to Texas topside thumbnail image

ALE returns to Texas topside

January 16 - ALE has placed the second of three modules on top of an offshore topside in Texas, USA.
Views: 852
STS crane loaded at Bilbao thumbnail image

STS crane loaded at Bilbao

January 16 - Grupo Altius has coordinated the loading of a fully erected ship-to-shore (STS) crane at the port of Bilbao, Spain in cooperation with Marítima Davila and Toro y Betolaza.
Views: 716

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.