Latest news from Heavy Lift & Project Forwarding International Magazine

Sarens loads out in Wallsend

Sarens has loaded out a 580-tonne pile template in Wallsend, UK on behalf of Van Oord.

Van Oord is responsible for installing 102 three-legged jacket foundations for Scottish Power Renewables (part of the Iberdrola Group), which is building the East Anglia ONE offshore wind farm in the North Sea.

To transport the offshore structure, which had a diameter of 38 m, Sarens utilised link spans measuring 21 m in length.

While most of the equipment used for the load-out, including SPMTs and mobile cranes, arrived at the project site from the UK, the link spans were delivered from the Netherlands.

During the load-out operation, Sarens had to line up the pile template with the link span design before driving the structure on to a barge for onward transportation.

www.sarens.com

www.vanoord.com

Heavy Lift | News

Gantry on the move thumbnail image

Gantry on the move

June 13 - Collett & Sons loaded a 100-tonne gantry onto double bogie trailers ahead of a 250 mile (402.3 km) journey from the heavy haulier's depot in Goole to Gatwick, UK.
Views: 543
Pipeline shipment for Dimerco thumbnail image

Pipeline shipment for Dimerco

June 13 - Dimerco has delivered 33 tons (30 tonnes) of valves for an aviation fuel pipeline that will connect with the under-construction Beijing Daxing International Airport.
Views: 486
Heavy Lift Awards shortlist announced thumbnail image

Heavy Lift Awards shortlist announced

June 12 - After a rigorous judging process by our panel of industry experts, the shortlist has been revealed for the Heavy Lift Awards 2019.
Views: 948

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.