Latest news from Heavy Lift & Project Forwarding International Magazine

Heavy Lift Across the World

An Indonesian first for Kaleido

Kaleido Logistics has handled the delivery of wind turbine components for Indonesia’s first wind farm located in the South Sulawesi region. 


Kaleido was responsible for the ocean transport from China to Indonesia, as well as arranging floating cranes, stevedoring services and the inland transportation.

In one phase of the project, Kaleido used specialist barges to transport 90 tower sections from Ciwandan to Parepare Port in Indonesia. 

In addition to the design and optimisation of the storage yard, Kaleido handled the transhipment of 90 wind turbine blades in Parepare Port as well as the road transport to site.

Kaleido, member of the Worldwide Project Consortium (WWPC) in Spain, was also responsible for the road transport of the nacelles and hubs of 30 wind turbine generators.

 

www.kaleidologistics.com 

www.wwpc.eu.com

Heavy Lift | News

Chipolbrok Atlantic’s adventure continues thumbnail image

Chipolbrok Atlantic’s adventure continues

December 13 - Chipolbrok Atlantic has completed its voyage from St Petersburg to India, loaded with 658 individual pieces with a combined weight of 4,110 tonnes.
Views: 527
TWC crawler cranes get a boost thumbnail image

TWC crawler cranes get a boost

December 12 - Global lifting equipment manufacturer Terex will supply Singapore-based Tiong Woon Corporation (TWC) with a boom booster kit for the heavy lift and haulage service provider’s three Demag CC 8800-1 crawler cranes.
Views: 477
Varanasi terminal inaugurated thumbnail image

Varanasi terminal inaugurated

December 10 - Liebherr mobile cranes have handled their first cargoes at the Varanasi inland waterway terminal, India.
Views: 663

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.