Latest news from Heavy Lift & Project Forwarding International Magazine

Heavy Lift Across the World

Overcoming low water levels with Dan-Czech

Dan-Czech Specialtransport has handled the delivery of a 110-tonne turbine from the Siemens factory in Görlitz, Germany to Avonmouth, UK.

As a result of low water levels on the river Elbe, the turbine had to be transported via Nuremberg. According to Dan-Czech, the turbines would usually be transported via Dresden or Aken.

From Nuremberg the turbine was transported to Rotterdam by barge, where it was loaded onto a vessel for onward transportation to Avonmouth.

For the road transport from the factory to the loading dock in Nuremberg, the combination measured 26.5 m x 4.7 m x 5.25 m and weighed 163.4 tonnes, excluding the push truck.

In total, it took three weeks to transport the equipment from Görlitz to its final destination.

dan-czech.cz

Heavy Lift | News

Buss launches JV with Idea thumbnail image

Buss launches JV with Idea

June 14 - Hamburg-based Buss Offshore Solutions and French logistics provider Idea established a joint venture that will serve the offshore market in France.
Views: 450
ALS moves in Hull thumbnail image

ALS moves in Hull

June 14 - UK-headquartered Abnormal Load Services (ALS) is relocating to larger premises in Hull.
Views: 421
Seville ships Haliade towers thumbnail image

Seville ships Haliade towers

June 14 - Tower sections that will make up General Electric’s (GE) Haliade-X offshore wind turbine have been loaded onto the multipurpose vessel Palmerton at the port of Sevilla, Spain.
Views: 452
Gantry on the move thumbnail image

Gantry on the move

June 13 - Collett & Sons loaded a 100-tonne gantry onto double bogie trailers ahead of a 250 mile (402.3 km) journey from the heavy haulier's depot in Goole to Gatwick, UK.
Views: 481

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.