Latest news from Heavy Lift & Project Forwarding International Magazine

Heavy Lift Across the World

Montcalm expands with Liebherr

Brazil’s Montcalm Montagens Industriais has taken delivery of a 250-tonne capacity Liebherr LTM 1250-5.1 mobile crane.

For its first job, the crane will be used for assembly work at General Electric’s (GE) Sergipe thermoelectric power plant located in Barra dos Coqueiros.

Montcalm’s fleet also includes a 400-tonne capacity LR 1400/2, two 220-tonne capacity LTR 1220s and a 100-tonne capacity LTR 1100 from Liebherr.

www.liebherr.com

www.montcalm.com.br

Heavy Lift | News

From Antwerp to Açu thumbnail image

From Antwerp to Açu

May 17 - Earlier this month, BBC Amethyst anchored in Porto do Açu, making it the first vessel to cross from Antwerp to the Brazilian seaport.
Views: 2176
ALE moves crane in one piece thumbnail image

ALE moves crane in one piece

April 16 - ALE is utilising its fleet of SPMTs for the relocation of a Manitowoc 18000 crawler crane as part of the Loma Blanca wind farm project in Argentina.
Views: 2184
Freight Traders on the double thumbnail image

Freight Traders on the double

April 11 - Freight Traders has coordinated the transport of a drilling rig from Whangarei port in New Zealand to St Vincent in the Caribbean.
Views: 1985
GAC sets up in Guyana thumbnail image

GAC sets up in Guyana

April 8 - GAC has established GAC Logistics and Shipping (Guyana), which will provide support for oil and gas clients in the Atlantic region of South America.
Views: 2083

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.