Latest news from Heavy Lift & Project Forwarding International Magazine

Blades travel through Emden

EPAS Ems Ports Agency & Stevedoring has handled the offloading of 24 wind turbine blades at the Seaports of Niedersachsen's north quay in Emden, on behalf of turbine manufacturer Enercon.

 The cargo arrived at the port from Brazil onboard the multipurpose vessel Orange River. According to the Seaports of Niedersachsen, with a draft of 10.9 m and a length of 189.9 m, it is one of the largest vessels allowed to sail into the inland port of Emden.

Each blade measured 44 m in length and is destined for the onshore wind farm at Nordkai.

 

www.seaports.de

www.epas-emden.de

Heavy Lift | News

Big Carl arrives at Bristol Port thumbnail image

Big Carl arrives at Bristol Port

May 23 - Sarens’ SGC 250 crane is presently in storage at Bristol Port, UK ahead of its delivery to the Hinkley Point C nuclear power plant.
Views: 45
CakeBoxx enters coil market thumbnail image

CakeBoxx enters coil market

May 22 - CakeBoxx Technologies has launched the 20 ft CoilBoxx container, specifically designed for the transportation of steel and aluminium coils.
Views: 304
Mammoet in Meyer takeover thumbnail image

Mammoet in Meyer takeover

May 22 - Mammoet has agreed to acquire heavy lifting, installation and assembly specialist Meyer Anlagenbau.
Views: 571

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.