Latest news from Heavy Lift & Project Forwarding International Magazine

Double delivery for Faymonville

Transportes Lalgy in Mozambique has taken delivery of a seven-axle CombiMAX low loader system from Faymonville.

The order comprised a two-axle line unit, a four-axle line unit and a bogie. More axles and accessories can be added to expand capacities even further, said Faymonville.

Meanwhile, South Africa-based Lovemore Bros has taken delivery of a self-propelled ModulMAX G-SL multi-axle trailer.

The four-axle Faymonville trailer is powered by a 228 kW Cummins engine.

www.faymonville.com

www.lalgy.co.mz

lovemore.co.za

Heavy Lift | News

Ian Martin Jones passes away thumbnail image

Ian Martin Jones passes away

June 17 - We are sad to report that Ian Martin Jones, ex-HLPFI editor, passed away peacefully earlier today.
Views: 173
Brown joins SAL in the USA thumbnail image

Brown joins SAL in the USA

June 17 - Phillip Brown has been appointed as vice president – projects for SAL Heavy Lift in the USA, effective July 1, 2019.
Views: 571
Multipurpose TOS introduced thumbnail image

Multipurpose TOS introduced

June 17 - CyberLogitec has introduced OPUS Terminal M, a multipurpose terminal operating system (TOS) that can coordinate containers, breakbulk, project, bulk and ro-ro cargoes.
Views: 227
Mohembo bridge parts move in Namibia thumbnail image

Mohembo bridge parts move in Namibia

June 17 - 10,720 tonnes of project cargo, destined for the Mohembo bridge project in Botswana, has moved through the port of Walvis Bay in Namibia.
Views: 250

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.