Latest news from Heavy Lift & Project Forwarding International Magazine

Benchmark set for wind farm shipment

December 8 - Martin Bencher has shipped 60 transition pieces for the Arkona offshore wind farm on behalf of manufacturer Bladt Industries.

The 300-ton (272-tonne) transition pieces were transported in an upright position from Denmark to Germany onboard Amasus Shipping's vessel, Jaguar.

Martin Bencher, which was responsible for the ocean transport and project management, engineered, produced and installed a sea-fasting system in the ocean-going vessel for the transport.

A video of the project can be viewed here.

 

www.martin-bencher.com

www.amasus.nl

Heavy Lift | News

ABP steels itself with new contract thumbnail image

ABP steels itself with new contract

January 15 - UK freight forwarding company R.M. Maritime has contracted Associated British Ports (ABP) to handle steel at the port of Immingham.
Views: 476
Rosyth welcomes MHC thumbnail image

Rosyth welcomes MHC

January 15 - The port of Rosyth, which is owned by Forth Ports, has taken delivery of a LHM 550 mobile harbour crane from Liebherr.
Views: 621
Final Deutsche Bucht foundations depart Cuxport thumbnail image

Final Deutsche Bucht foundations depart Cuxport

January 15 - Cuxport Terminal in Germany welcomed Seajacks’ installation vessel Scylla on December 30 to load the final foundation structures for the Deutsche Bucht offshore wind farm.
Views: 450

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.