Latest news from Heavy Lift & Project Forwarding International Magazine

ALE steels in Silao

ALE has lifted modules weighing up to 300 tonnes during the construction of a steel mill plant in Silao, Mexico.

Throughout January, ALE lifted several items at the project site, including roof panels and plant modules, using a 1,350-tonne capacity LR 11350 crawler crane.

The crane was configured with a P boom, which ALE said minimised congestion on site thanks to its small footprint. This in turn minimised disruption to the overall construction schedule and saved time and costs, according to ALE.

www.ale-heavylift.com

Heavy Lift | News

ECOL gets certified thumbnail image

ECOL gets certified

August 21 - The European association of abnormal road transport and mobile cranes (ESTA) said that its European Crane Operators’ Licence (ECOL) has been awarded ISO 9001-2015 certification.
Views: 263
Mammoet keeps it clean in Texas thumbnail image

Mammoet keeps it clean in Texas

August 13 - Mammoet has introduced a wash facility to clean its fleet of heavy equipment at its facility in Rosharon, Texas.
Views: 1210

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.