Latest news from Heavy Lift & Project Forwarding International Magazine

Fagioli moves in Modena

Fagioli has transported a 245-ton (222.3-tonne) transformer from Modena to the Ostiglia river port in Italy.

 

Measuring 9.8 m x 4.5 m x 3.9 m, the transformer was loaded onto 12 axle lines of SPMTs and moved outside of the manufacturing facility where it was subsequently positioned onto a Schnabel support structure.

Once secured on the trailer combination, the convoy, measuring 75 m in length, began its journey to the Ostiglia river port.

A mobile crane provided by Autovictor then loaded the unit onto a barge owned by Fagioli for onward transportation to Marghera port.

Once the barge arrives in Marghera, the transformer will be loaded onto a vessel for final delivery in Norway.

fagioli.com

www.autovictor.it

 

Heavy Lift | News

Al Faris supports Expo 2020 thumbnail image

Al Faris supports Expo 2020

December 6 - Al Faris has lifted and installed steel structures measuring up to 46 m in length at a construction project associated with the upcoming Expo 2020 in Dubai.
Views: 308
CS Wind places Kalmar order  thumbnail image

CS Wind places Kalmar order 

December 6 - Kalmar will supply CS Wind Vietnam with two Super Gloria reachstackers, each with a lifting capacity of 100 tons (90.7 tonnes). 
Views: 368
ALE supports maintenance works in Argentina thumbnail image

ALE supports maintenance works in Argentina

December 6 - ALE removed the rotors of three generators at an aluminium smelting facility in Puerto Madryn, Argentina as part of a scheduled maintenance programme.
Views: 369

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.