Latest news from Heavy Lift & Project Forwarding International Magazine

Lankhorst Ropes supplies slings to Seaway 7

Lankhorst Ropes has supplied heavy lift slings to Seaway 7 for use on the Dolphin Accommodation Upgrade Project (DAUP) for Shell Trinidad & Tobago.


Subsea 7 was appointed to transport and install a permanent living quarter module for the Dolphin platform on the East Coast Marine Area (ECMA), offshore Trinidad and Tobago. The slings were used to lift the 1,110-tonne module, which includes a control room, living quarters and helideck, onto the platform.

Lankhorst supplied three Lankoforce slings for the task: one 520-tonne minimum break load (MLB) sling measuring 104 m in length with rope diameter 64 mm; another 520-tonne MBL sling, which measured 47.2 m in length; and a 46.1 m-long rope with a load capacity of 1,300 tonnes.

www.lankhorstropes.com

www.seawayheavylifting.com.cy

Heavy Lift | News

Straightpoint and Crosby in FPSO tests thumbnail image

Straightpoint and Crosby in FPSO tests

November 28 - Dalaz Teknik Utama has used a 12-tonne capacity Radiolink, a Straightpoint load cell and a Crosby shackle to complete a series of tests at a Wasco Energy fabrication yard in Indonesia.
Views: 1250
Crew boat gets lift from Barnhart thumbnail image

Crew boat gets lift from Barnhart

November 11 - Barnhart Crane & Rigging, on behalf of Premier Bulk Stevedoring, has lifted and transferred a crew boat, measuring 110 ft (33.5 m) long, in Alabama.
Views: 1958

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.