Latest news from Heavy Lift & Project Forwarding International Magazine

Coordinadora delivers in Cádiz 

Coordinadora has coordinated the delivery of oversized cargoes from the port of Avilés to the San Roque refinery in Spain.

The components included a 187-ton (169.6-tonne) reactor, which measured 7.8 m x 7.6 m x 5 m, and a regenerator, which weighed 50 tons (45.4 tonnes) and measured 18.7 m x 6.4 m x 5.15 m. 

In Avilés, the units were loaded onto a vessel for transportation to Algeciras Bay, a distance of 800 nautical miles. 

The cargoes were subsequently unloaded and transported 4 km by road to the refinery in Cádiz. 

www.coordinadoraetm.com

Heavy Lift | News

Volga-Dnepr to expand at Leipzig thumbnail image

Volga-Dnepr to expand at Leipzig

June 19 - Volga-Dnepr Group and Mitteldeutsche Flughafen (MFAG) have signed a memorandum of understanding (MoU) to expand their partnership at Leipzig/Halle Airport in Germany.
Views: 248
Jan De Nul lands Formosa 2 contract thumbnail image

Jan De Nul lands Formosa 2 contract

June 19 - Jan De Nul Group has been awarded an engineering, procurement, construction and installation (EPCI) contract for Taiwan’s Formosa 2 offshore wind farm.
Views: 227

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.