DAKO Worldwide Transport coordinated the delivery of four boilers destined for the North Stream pipeline project.

The boilers were shipped from their manufacturing site in Bavaria to Lumbin in northeastern Germany.

The boilers, which measured more than 5 m in height, were trucked to the port of Roth before being loaded onto barges for the journey to Lumbin.

www.dakoworld.com