Latest news from Heavy Lift & Project Forwarding International Magazine

Roll-Lift handles YCI-M1 shipment

Roll-Lift USA has transported 12 units for the YCI methanol one  (YCI-M1) project in Louisiana, USA.

The components were transported by road from the port of New Orleans using a Scheuerle nine-axle highway trailer; two Highway Giant dual-lane trailers, also from Scheuerle; plus 18 axle lines of Kamag K25 modular trailers. 

The units had a loaded height of 17 ft (5.2 m) and their transport required extensive coordination with local government agencies and the utility company, said Roll-Lift

Roll-Lift USA will also be responsible for the onsite lifting and installation at the YCI-M1 project site. The largest crane within Roll-Lift’s fleet, the Liebherr LR11350, will be utilised for this phase of the project. The crane is currently working on the construction of the Raiders stadium in Las Vegas. 

www.roll-group.com

Heavy Lift | News

Breakbulk volumes on the up at NWSA thumbnail image

Breakbulk volumes on the up at NWSA

August 21 - Year-to-date breakbulk volumes at the Northwest Seaport Alliance (NWSA) are up by 18.3 percent, compared to the same period last year, reaching 163,650 tonnes.
Views: 126
ECOL gets certified thumbnail image

ECOL gets certified

August 21 - The European association of abnormal road transport and mobile cranes (ESTA) said that its European Crane Operators’ Licence (ECOL) has been awarded ISO 9001-2015 certification.
Views: 120
ALS moves thruster thumbnail image

ALS moves thruster

August 21 - Abnormal Load Services (ALS) has transported a 36-tonne thruster measuring 5.81 m x 5.81 m x 1.35 m from Poland to a hydroelectric power station in Wales, UK.
Views: 102

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.