Latest news from Heavy Lift & Project Forwarding International Magazine

SGRE opts for Oostende for SeaMade

Siemens Gamesa Renewable Energy (SGRE) has selected the Renewable Energy Base Oostende (REBO) at the Belgium port for the construction of 58 wind turbines destined for the SeaMade offshore wind farm.

In 2020, the REBO terminal will be used for the construction and relocation of the towers, nacelles and blades for the 487 MW wind farm, located approximately 40 to 50 km off the Belgian coast.

Speaking about the port of Oostende, Emmanuël Timmermans, business development manager of REBO, said: “The Rentel project has just been completed, the foundations for the Northwester II windfarm in Oostende will be installed in 2019, and for 2020 there is now the agreement with SeaMade.”

The 58 wind turbines for the SeaMade scheme have a hub height of 109 m and a rotor diameter of 167 m.

www.reboostende.be

www.portofoostende.be

www.siemensgamesa.com

Heavy Lift | News

ALE returns to Texas topside thumbnail image

ALE returns to Texas topside

January 16 - ALE has placed the second of three modules on top of an offshore topside in Texas, USA.
Views: 124
STS crane loaded at Bilbao thumbnail image

STS crane loaded at Bilbao

January 16 - Grupo Altius has coordinated the loading of a fully erected ship-to-shore (STS) crane at the port of Bilbao, Spain in cooperation with MarĂ­tima Davila and Toro y Betolaza.
Views: 136
Meriaura appoints two thumbnail image

Meriaura appoints two

January 16 - Meriaura Group has appointed Bengt-Erik Rosin as managing director and Ville Koskinen as managing director of VG-Shipping, its ship management subsidiary.
Views: 180
Weldex expands fleet with Liebherr thumbnail image

Weldex expands fleet with Liebherr

January 16 - UK-based crane contractor Weldex has taken delivery of a 1,000-tonne lifting capacity LR 11000 crawler crane from Liebherr.
Views: 149

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.