Latest news from Heavy Lift & Project Forwarding International Magazine

Vancouver welcomes record Vestas shipment 

The port of Vancouver USA has received what it claims to be the largest single shipment of wind turbine blades in Vestas’ history.

The heavy lift vessel Combi Dock I arrived at the port with 198 Vestas blades; surpassing the previous record of 156 blades on a single ship.

Each blade was manufactured in Italy and measured 49 m in length. They were shipped from the port of Taranto. 

The port of Vancouver’s two Liebherr mobile harbour cranes were used to unload the blades. 

Once unloaded, they were moved to laydown space at the port’s Terminal 5. From there, they will be transported by truck to the Marengo wind farm near Dayton, Washington. The blades will be used to re-power existing turbines.

 

www.portvanusa.com

www.combi-lift.net

Heavy Lift | News

Collett delivers footbridge thumbnail image

Collett delivers footbridge

July 19 - Collett & Sons has delivered six over-dimensional bridge components to Worcester in the UK.
Views: 290
Sims Crane appoints Lester thumbnail image

Sims Crane appoints Lester

July 19 - Florida’s Sims Crane & Equipment has named Jared Lester as its business development manager. 
Views: 370
ITI and FHS to open Florida training centre thumbnail image

ITI and FHS to open Florida training centre

July 19 - Florida Handling Systems (FHS), a Mazzella Company, and Industrial Training International (ITI) have confirmed that they will develop a training centre in Bartow, Florida.
Views: 404

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.