Latest news from Heavy Lift & Project Forwarding International Magazine

Cosmatos on the double

Cosmatos Shipping Services has coordinated port handling and operations involved in the delivery of six refinery columns and 86 loose parts in Greece.

The shipment had a total volume of 1,500 cu m. The largest column measured 27 m x 2.5 m x 2.5 m and weighed 20 tons (18.2 tonnes).

The cargoes originated from Thessaloniki and were destined for Port Said in Egypt.

In a separate project, Cosmatos coordinated the discharge, storage and transportation of four wind turbines, with blades measuring 65 m in length, at Thessaloniki port.

Cosmatos is the Greek member of the Worldwide Project Consortium (WWPC).

www.cosmatosgroup.com

www.wwpc.eu.com

Heavy Lift | News

ACS delivers in Japan thumbnail image

ACS delivers in Japan

August 20 - Air Charter Service (ACS) has coordinated the shipment of a 35-tonne flight simulator from Texas to Japan using a Boeing 747.
Views: 193
FROM THE MAGAZINE: Pumping up power thumbnail image

FROM THE MAGAZINE: Pumping up power

August 19 - As nations reduce their reliance on fossil-fuelled power generation, hydropower projects – in particular pumped storage schemes – will play a key role in supplementing wind and solar energy developments.
Views: 452
Jan De Nul secures Kriegers Flak work thumbnail image

Jan De Nul secures Kriegers Flak work

August 16 - Jan De Nul Group will transport and install 72 Siemens wind turbine generators – with a capacity of 8.4 MW each – for the Kriegers Flak offshore wind farm in Denmark.
Views: 764

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.