Latest news from Heavy Lift & Project Forwarding International Magazine

Mohembo bridge parts move in Namibia

10,720 tonnes of project cargo, destined for the Mohembo bridge project in Botswana, has moved through the port of Walvis Bay in Namibia.

The cargoes arrived at the port on the vessel Nomadic Milde. The components will be used to complete the construction of 1.2 km-long bridge that will connect villages on the east of the Okavango River with the rest of the country.

It is expected to take 160 truckloads to transport the cargo to the construction site in Botswana.

www.namport.com.na

Heavy Lift | News

Antonov soars with drum shipment thumbnail image

Antonov soars with drum shipment

November 13 - Antonov Airlines has delivered two drying drums from Paris-Vatry Airport, France to Port Hedland International Airport, Australia on behalf of chemical company Yara Pilbara Nitrates (YPN).
Views: 169
HKV lifts with Liebherr thumbnail image

HKV lifts with Liebherr

November 13 - Cologne-based HKV Schmitz + Partner has used three 500-tonne capacity Liebherr cranes to move a gas turbine at Worringen.
Views: 184
AN-22 delivers to Baghdad thumbnail image

AN-22 delivers to Baghdad

November 11 - Antonov Airlines utilised one of its AN-22 Antei heavy lift aircraft to deliver military helicopters and spare parts from Spain to Iraq.
Views: 443
Crew boat gets lift from Barnhart thumbnail image

Crew boat gets lift from Barnhart

November 11 - Barnhart Crane & Rigging, on behalf of Premier Bulk Stevedoring, has lifted and transferred a crew boat, measuring 110 ft (33.5 m) long, in Alabama.
Views: 608

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.