Latest news from Heavy Lift & Project Forwarding International Magazine

STS crane loaded at Bilbao

Grupo Altius has coordinated the loading of a fully erected ship-to-shore (STS) crane at the port of Bilbao, Spain in cooperation with Marítima Davila and Toro y Betolaza.

It took 12 hours to load the 1,280-tonne Kalmar crane, which was 68 m tall and 27 m wide, onto BigLift’s multipurpose Happy Star vessel. It was brought alongside the ship on SPMTs and lifted on board using the ship’s own cranes.

The crane is bound for a container terminal in Guadalupe.

www.grupoaltius.com

www.mdavila.com

www.torobe.com

www.bigliftshipping.com

Heavy Lift | News

Tschudi delivers for Belgian paper mill thumbnail image

Tschudi delivers for Belgian paper mill

August 22 - Tschudi Logistics has coordinated the delivery of five digesters and a liquor accumulator for Burgo Ardennes’ paper mill in Belgium.
Views: 196
ACS delivers in Japan thumbnail image

ACS delivers in Japan

August 20 - Air Charter Service (ACS) has coordinated the shipment of a 35-tonne flight simulator from Texas to Japan using a Boeing 747.
Views: 352

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.