Latest news from Heavy Lift & Project Forwarding International Magazine

Sun shines with Chipolbrok

Chipolbrok has called at the port of Esbjerg in Denmark to offload wind turbine towers that originated in China.

Chipolbrok Sun, measuring 190 m long and 28 m wide, had to navigate shallow waters and narrow waterways around the island of Fanø to deliver the components at the port. From there, the vessel proceeded to Hamburg, Germany to load project cargoes destined for India before heading to Antwerp, Belgium to collect a number of heavy lift components.

The cargoes loaded in Antwerp included units weighing up to 136 tonnes, destined for Karachi, Pakistan; 75-tonne components for Mumbai, India; and a 128-tonne package that will be transported to Shanghai, China.

 

The last port of loading for Chipolbrok Sun was Izmir in Turkey, where dismantled rig components were loaded for onward transportation to Mumbai.

chipolbrok.com.pl

Heavy Lift | News

FROM THE MAGAZINE: Pumping up power thumbnail image

FROM THE MAGAZINE: Pumping up power

August 19 - As nations reduce their reliance on fossil-fuelled power generation, hydropower projects – in particular pumped storage schemes – will play a key role in supplementing wind and solar energy developments.
Views: 346
Jan De Nul secures Kriegers Flak work thumbnail image

Jan De Nul secures Kriegers Flak work

August 16 - Jan De Nul Group will transport and install 72 Siemens wind turbine generators – with a capacity of 8.4 MW each – for the Kriegers Flak offshore wind farm in Denmark.
Views: 676
Pretty in pink for TGP thumbnail image

Pretty in pink for TGP

August 16 - Trans Global Projects Group (TGP) has delivered 62 modules to a mining site near Newman, Australia.
Views: 591

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.