Wangfoong handles Marriott cargoes

Wangfoong Transportation has delivered out-of-gauge (OOG) acrylic panels to the Ocean Park Marriott Hotel Hong Kong.

Wangfoong's project scope included storage and delivery of the components by barge as well as transporting the OOG cargoes by road.

The cargoes had to be repacked for the road transport in order to reduce the width of components from over 5 m to 4.5 m.

Once on site, Wangfoong was responsible for the heavy lift operations.

A video of the project, which was completed in 2017, can be seen here.

Wangfoong is a member of the Worldwide Project Consortium (WWPC) in Hong Kong.

 

www.wangfoong.com.hk

www.wwpc.eu.com

Heavy Lift | News

Mammoet moves for Bridgewater

August 14 - Mammoet has transported a 3,152-ton (3,150.9-tonne) heat recovery steam generator (HRSG) module from Coeymans, New York to PSEG Power Connecticut’s Bridgeport Harbor Station 5 project site.
Views: 70

Panalpina handles Cabinda cargoes

August 14 - Panalpina has coordinated the transport of specialised pipes for the oil and gas industry from Malabo in Equatorial Guinea to Cabinda, Angola.
Views: 79

Hallett handles Heathrow cargoes

August 13 - Hallett Silbermann has delivered two Liebherr HS 8130 HD crawler cranes, each weighing 85 tonnes, to London Heathrow Airport as part of the airport's integrated baggage system construction project.
Views: 167

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.