Latest news from Heavy Lift & Project Forwarding International Magazine

Heavy Lift Across the World

Paderewski completes maiden call in Emden

Chipolbrok’s multipurpose vessel Paderewski made its maiden call at the German port of Emden to load wind energy equipment destined for Masan, South Korea.

Before the vessel arrived in Emden, Chipolbrok called in Hamburg to load several pieces of project and breakbulk cargo, including a 330-tonne gas turbine.

Once in Emden, 38 wind energy components, with a total weight of 538 tonnes, were secured on Paderewski. The largest pieces had a maximum length of 40.6 m and unit weights of up to 22 tonnes.

They were loaded onto the vessel on behalf of a Japanese logistics provider, representatives of which oversaw the handling and securing procedures. According to Chipolbrok, the stevedores were able to load all the components within 36 hours, which meant the vessel could depart the next morning.

After transiting the Suez Canal, Paderewski will call at Mumbai (India), Singapore, Kaohsiung (Taiwan) and Shanghai (China) before arriving in Masan at the end of September.

chipolbrok.com.pl

Heavy Lift | News

Straightpoint tests ringer crane capacity thumbnail image

Straightpoint tests ringer crane capacity

September 19 - Malaysia’s Goforth called on Sarsco Lifting Technical Services to witness the load test of a ringer crane using a Straightpoint load cell and a wireless 150-tonne capacity Radiolink.
Views: 516

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.