Latest news from Heavy Lift & Project Forwarding International Magazine

Heavy Lift Across the World

Sun shines with Chipolbrok

Chipolbrok has called at the port of Esbjerg in Denmark to offload wind turbine towers that originated in China.

Chipolbrok Sun, measuring 190 m long and 28 m wide, had to navigate shallow waters and narrow waterways around the island of Fanø to deliver the components at the port. From there, the vessel proceeded to Hamburg, Germany to load project cargoes destined for India before heading to Antwerp, Belgium to collect a number of heavy lift components.

The cargoes loaded in Antwerp included units weighing up to 136 tonnes, destined for Karachi, Pakistan; 75-tonne components for Mumbai, India; and a 128-tonne package that will be transported to Shanghai, China.

 

The last port of loading for Chipolbrok Sun was Izmir in Turkey, where dismantled rig components were loaded for onward transportation to Mumbai.

chipolbrok.com.pl

Heavy Lift | News

Jumbo moves for Formosa 1 thumbnail image

Jumbo moves for Formosa 1

August 14 - Jumbo has transported 20 transition pieces for Taiwan’s Formosa 1 Phase 2 offshore wind farm on behalf of Jan De Nul Group and Multi Marine Chartering.
Views: 776
Tariffs taking their toll thumbnail image

Tariffs taking their toll

August 9 - Last week, US President Donald Trump said that an additional 10 percent tariff will be imposed on Chinese-origin goods effective September 1, 2019.
Views: 1242
Barrus moves blade sets to Adygea thumbnail image

Barrus moves blade sets to Adygea

August 2 - Barrus Group has coordinated the delivery of 180 wind turbine blades from India to the Adygea wind farm, under development by NovaWind.
Views: 1599

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.