Latest news from Heavy Lift & Project Forwarding International Magazine

Heavy Lift Across the World

Taiwan’s Formosa 1 reaches logistics milestone

All 20 foundation monopiles destined for the Formosa 1 Phase 2 offshore wind farm project in Taiwan have left the EEW Special Pipe Construction yard in Germany on board two heavy lift vessels, according to the Jan De Nul Group.

Some of the components were loaded on board the semi-submersible vessel Sun Shine.

Now that the monopiles are on their way to the port of Taichung, installation activities at the site can begin soon.

As part of the project, Jan De Nul has coordinated the storage and transport of the foundation structures, as well as the installation of transition joint bays and land cables.

The Formosa 1 offshore wind farm is located 3 km off the coast of Miaoli.

www.jandenul.com

Heavy Lift | News

Straightpoint tests ringer crane capacity thumbnail image

Straightpoint tests ringer crane capacity

September 19 - Malaysia’s Goforth called on Sarsco Lifting Technical Services to witness the load test of a ringer crane using a Straightpoint load cell and a wireless 150-tonne capacity Radiolink.
Views: 237

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.