Latest news from Heavy Lift & Project Forwarding International Magazine

Heavy Lift Across the World

Argentinian roof skid for ALE

September 2 - ALE has skidded the 1,500-tonne roof of the eight-storey Centro Cultural Bicentenario in Buenos Aires into place.

The skidding took place in tandem with the manufacturing of the roof, ensuring the efficiency of the operation.

Each section of the roof, which had the total dimensions 52 m x 50 m x 5 m, was assembled on site and then skidded into position, while the next section was assembled. In total, twelve skidding operations were performed.

The equipment used included ten push-pull jacks with a 16-tonne and 25-tonne capacity, as well as 24 skidding flat systems providing 150-tonne capacity in two skidding tracks.

Once the skidding stage was completed, ALE withdrew the skids with partial jackings using twelve hydraulic cylinders with 50-tonne capacities.

 

 

www.ale-heavylift.com

Heavy Lift | News

Paderewski completes maiden call in Emden thumbnail image

Paderewski completes maiden call in Emden

August 23 - Chipolbrok’s multipurpose vessel Paderewski made its maiden call at the German port of Emden to load wind energy equipment destined for Masan, South Korea.
Views: 236
Peel Ports prepares for Brexit thumbnail image

Peel Ports prepares for Brexit

August 23 - The UK’s Peel Ports Group has been accredited as an authorised economic operator (AEO) at all of its principal ports.
Views: 207

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.