Latest news from Heavy Lift & Project Forwarding International Magazine

Heavy Lift Across the World

Terex gives Versailles a lift

August 28 - DUFOUR Transport Handling has used a Terex Superlift 3800 crawler crane to erect a footbridge at the Versailles Chantiers train station in France.

Installing the metal footbridge over the tracks meant that the Versailles station had to be temporarily closed. "For one weekend, the station was completely closed and, during lifting operations, train traffic was also fully stopped from Paris to the south of France, which rarely occurs," said Nicolas Devianne of DUFOUR.

The Terex Superlift 3800 lattice boom crawler crane was transported in components from a project site in Germany to the Versailles Chantiers station using 37 trucks. 

With the help of a 250-tonne capacity Terex AC 250 all terrain crane, the Superlift crane was assembled at the station. The superlift tray and crawler carrier were loaded with 225 tonnes and 50 tonnes of counterweight respectively.

To lift the two metal bridge components - weighing 80 and 111 tonnes respectively - into place, the crane also required 90 m of main boom. The 80-tonne unit was lifted first at a 76 m radius, while the 111-tonne piece was hoisted into place at a 51 m radius.

Watch a video of the lift below.

 

 

 

www.terex.com

www.dufour-transport.fr

Heavy Lift | News

Jinert transports transformers to Bredäng thumbnail image

Jinert transports transformers to Bredäng

October 11 - Hässleholm-based crane company and heavy lift transport provider Jinert has moved a 152-tonne transformer from Gröndal to a plant in Bredäng, a suburb in southwest Stockholm.
Views: 524
STA completes Mozyr delivery thumbnail image

STA completes Mozyr delivery

October 10 - STA Logistic has delivered a reactor tip from Italy to the Mozyr oil refinery in Belarus.
Views: 746

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.