Bristol Port recognised for nuclear power logistics role

The UK Government’s Department for Business, Energy and Industrial Strategy, and power generation company EDF Energy, have recognised Bristol Port for its role in the logistics supply chain for EDF’s Hinckley Point C nuclear power plant.

“The site is only 32 sea miles from us, 45 road miles, and we’ve become involved in every single element of the logistics supply chain,” said Bristol Port ceo David Brown.

“Sea transport is a very efficient and clean way to move very heavy items, from wherever they have been manufactured, into Bristol. The port acts as a muster point en route to Combwich Wharf, and onwards to the site itself.”

One of the main contractors for the project, Balfour Beatty, recently moved on to the port estate, where it will manufacture tunnel sections and underwater heads that will provide the power station with cooling water.

The port said that additional land is also being provided for the storage of abnormal indivisible loads – equipment that will travel to Hinckley by barge as it is too big to move by road.

www.bristolport.co.uk

www.edfenergy.com

 

Heavy Lift | News

Hinrichs joins Combi Lift

August 17 - Combi Lift has appointed Holger Hinrichs as managing director, joining Heiko Felderhoff in leading the Bremen-headquartered heavy lift shipping line.
Views: 342

Roll Group wins boiler transport

August 17 - Roll Group has been awarded a contract by Italian project forwarder Fagioli for the transportation of three boilers for the Gulf Coast Growth Ventures (GCGV) project in the USA.
Views: 456

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.