April 6 - FLS Projects has completed the discharging operations for ten heat recovery steam generator (HRSG) modules, shipped from South Korea and Vietnam to a 250 MW combined cycle project in Myingyan, Myanmar.

In total 47 packages, with a volume of more than 3,600 cu m, and a maximum unit weight of 130 tons (117.9 tonnes), were discharged onto barges alongside the vessel.

FLS is delivering approximately 5,000 cu m of breakbulk cargo to the Gulf Power project site in Prachinburi, Thailand.

The cargo arrived in Laem Chabang, Thailand at the end of February on heavy lift vessels in three shipments from Europe and the USA. The cargo was then transferred to the FLS yard in the Laem Chabang port area from where it is now being delivered to the project site in sequence to match the client's erection and installation schedule.

The deliveries include several complete control room units, turbines and generators with single cargo weights of more than 100 tonnes.

 

 

In a separate project, FLS discharged a shipment of 96 packages, with a volume of 750 cu m, in Pasir Gudang, Malaysia.

The cargo was shipped by FLS Indonesia from Jakarta and Batam, Indonesia. The consignment included transformers which weighed more than 50 tons (45 tonnes).

In Abu Dhabi, FLS has completed the loading operations for 28 packages of ducts, casing, beams and columns for the EMAL Aluminium Smelter Projects. The volume of the shipment was approximately 2,400 cu m, with some units measuring 27 m in length and weighing 40 tons (36.2 tonnes).

This the second of five shipments that FLS is handling from Taicang, China to Port Khalifa in Abu Dhabi.

www.fls-projects.com