Latest news from Heavy Lift & Project Forwarding International Magazine

KOG navigates Gotthard tunnel

December 16 - KOG Transport has coordinated the delivery of a 48-tonne THF recovery plant unit from Basel, Switzerland to Patrica in Italy via the Gotthard road tunnel.

The unit, which measured 22 m long by 4.5 m wide and 4 m high, was transported by road through the 17 km long tunnel, which has a height limit of just 4.5 m.

KOG arranged for the oversize piece to be moved on a flatbed truck with telescopic chassis, accompanied by a support vehicle and police escort.

Due to the size of the unit the transport had to take place at night, with the entire journey - which totalled about 1,000 km - spanning around six nights.

KOG in Switzerland was contracted by Sulzer to deliver the recovery plant unit, which is used to bind solvents in a production process.

 

www.kogtransport.com

Heavy Lift | News

Fitzgerald returns to Crowley  thumbnail image

Fitzgerald returns to Crowley 

February 21 - Crowley Maritime Corporation has appointed Ray Fitzgerald as its chief operating officer, effective March 1. 
Views: 398
KENC completes engineering scope for Jumbo thumbnail image

KENC completes engineering scope for Jumbo

February 21 - The Netherlands-based KENC Engineering has collaborated with Jumbo to prepare the heavy lift vessel Fairplayer for an FPSO installation project offshore Brazil. 
Views: 336

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.