Latest news from Heavy Lift & Project Forwarding International Magazine

ALE executes pit move

ALE has lifted and transported a sulphur storage facility for the Lindsey Oil Refinery in the UK.

The storage system consisted of a concrete pit, weighing 304 tonnes, and a 90-tonne lid.

To lift the units ALE mobilised a gantry system, which includes jacking points that can operate in unison for optimum control and safety. Once the pit was raised, SPMTs were positioned beneath in preparation for onward transportation.

The pit was moved approximately 2 miles (3.22 km) along public roads and across the project site. Due to the smaller size of the lid, ALE said the transport for this component was able to use a much shorter and more direct route.

www.ale-heavylift.com

Heavy Lift | News

Digitalisation: solving one problem at a time  thumbnail image

Digitalisation: solving one problem at a time 

May 26 - The life of a project logistician can be dominated by spreadsheets. Could new software and technologies help to streamline process and boost productivity? Chris Lewis reports. 
Views: 1584
Järvinen departs Nurminen thumbnail image

Järvinen departs Nurminen

May 25 - Mikko Järvinen has stepped down as senior vice president sales at Nurminen Logistics.
Views: 689

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.