Latest news from Heavy Lift & Project Forwarding International Magazine

Salvage work begins at Rostock

Two 50 m-long lattice booms have been salvaged from the harbour basin at the port of Rostock, Germany.



At the end of January, two Liebherr mobile harbour cranes rolled off the deck of a heavy lift vessel into the water at Rostock. As part of the salvage operations, subsea contractor Baltic Taucherei- und Bergungsbetrieb Rostock detached the lattice booms from the cranes and cut them into smaller pieces.

The floating crane Baltic Lift, which has a maximum lifting capacity of 200 tonnes, raised the boom parts out of the water and placed them onto land. The parts were subsequently cleaned and will be stored at Liebherr-MCCtec’s facilities in Rostock.

Further salvage work will see Hebo Maritiemservice’s floating crane Hebo Lift 9 lift the mobile harbour cranes out of the water. The floating crane has a maximum lifting height of 67 m and a maximum capacity of 800 tonnes.

baltic-taucher.com

www.hebo-maritiemservice.com

www.liebherr.com

www.rostock-port.de

Heavy Lift | News

Schneider heads up Röhlig Germany thumbnail image

Schneider heads up Röhlig Germany

May 22 - Röhlig Logistics appointed Dirk Schneider as managing director of the company’s German organisation at the beginning of April.
Views: 692
myDHLi launched thumbnail image

myDHLi launched

May 21 - DHL Global Forwarding has launched myDHLi – an integrated online platform for its freight forwarding customers
Views: 723

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.