Latest news from Heavy Lift & Project Forwarding International Magazine

Oxbo is busy in Oregon

Oxbo Mega Transport Solutions has removed three transformers, units, weighing 130,000 lbs (59 tonnes) each, from the Dalles dam in Washington, USA.

The units, which were removed with a jack and slide system, and measured 5 m x 3 m x 4.75 m. They were transported to Salem, Oregon using a girder bridge trailer.
 

The total gross vehicle weight for each load was 242,000 lbs (109.7 tonnes).

Meanwhile, Oxbo was contracted to transport two evaporator vessels approximately 920 miles (1,480.6 km) from a fabrication facility in Oregon fabrication facility to a chemical plant in central California.

To handle the components, which weighed 138,000 lbs (62.6 tonnes), Oxbo deployed SPMTs from Goldhofer and 13-axle trailers.

The evaporator vessels measured 90 ft (27.4 m) in length.

Oxbo also replaced a set of transformers, weighing 50,000 lbs (22.7 tonnes) each, at a dam in Oregon using a jack and slide system.

www.oxboinc.com

Heavy Lift | News

Tyne moves Bedford lifeboat thumbnail image

Tyne moves Bedford lifeboat

April 18 - After almost two years in covered storage, the historic Bedford lifeboat has been relocated from the port of Tyne to the North East Maritime Trust’s yard in the UK, ahead of a restoration project.
Views: 504
Collett adds tractor unit thumbnail image

Collett adds tractor unit

April 16 - Collett & Sons has taken delivery of a MAN TGX 26.580 6x4 heavy-duty truck, with two more scheduled to arrive in the coming weeks.
Views: 715
ESTA honours members with 2019 awards thumbnail image

ESTA honours members with 2019 awards

April 12 - The ESTA Awards of Excellence 2019 had another successful year honouring and recognising members that have excelled in their field of operations.
Views: 1142

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.