Latest news from Heavy Lift & Project Forwarding International Magazine

Construction progresses for Wagenborg newbuild

The first sections of Royal Wagenborg’s newbuild multipurpose vessel have been transported from the construction hall to the quayside at the Royal Niestern Sander shipyard in the Netherlands.

The vessel will be the second EasyMax-type ship in Wagenborg’s fleet. The first, Egbert Wagenborg, was delivered in 2017.

The ship will measure 149.95 m in length and have a load capacity of 14,000 tons (12,700.6 tonnes). The ship design was developed by Wagenborg and Niestern Sander,

Construction of the second vessel began in April 2019. Delivery is planned for October 2021.

www.wagenborg.com

Heavy Lift | News

MIS moves engine across Oman thumbnail image

MIS moves engine across Oman

September 13 - Muscat International Shipping & Logistics (MIS) has transported a 140-ton (127-tonne) Wärtsilä engine from a power station in Khasab to Duqm, Oman.
Views: 476
Zeamarine picks Rhenus for Dutch calls thumbnail image

Zeamarine picks Rhenus for Dutch calls

September 11 - Rhenus Logistics has signed a contract with heavy lift shipping line Zeamarine for the provision of stevedoring and ship agency services at the port of Rotterdam.
Views: 1029

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.