Latest news from Heavy Lift & Project Forwarding International Magazine

Haliade-X components on the move

A wind turbine blade from LM Wind Power, measuring 107 m long, has arrived at the port of Blyth in the UK for testing at Offshore Renewable Energy Catapult’s facilities.

 

The blade, designed to operate from GE’s Haliade-X 12 MW turbine, arrived at the port on board Symphony Shipping’s vessel Symphony Space.

Once at the test facility, the blade will undergo a range of testing procedures to study its ability to withstand peak wind conditions.

The Haliade-X nacelle, meanwhile, is on its way to Rotterdam, the Netherlands from Saint-Nazaire, France on board BigLift Shipping’s heavy lift vessel Happy Sky. A video of the loading in Saint-Nazaire can be seen here.

Three other 107 m blades will soon be shipped to the prototype site in Rotterdam.

According to GE, both the nacelle and blades will initially be installed onshore for testing, which will allow the company to collect the necessary data to obtain the type certificate – a key step in the commercialisation of the turbine.

www.bigliftshipping.com

portofblyth.co.uk

www.ge.com

ore.catapult.org.uk

www.symphonyshipping.nl

Heavy Lift | News

Challenges facing towage and offshore operators thumbnail image

Challenges facing towage and offshore operators

September 20 - Sandro Lipani, director chartering and operations for Malta-based Augustea Maritime Transportation, discusses some of the challenges of operating in the towage and offshore support sector.
Views: 429
Allseas wins decommissioning work thumbnail image

Allseas wins decommissioning work

September 20 - Allseas has been awarded a contract for the removal, transfer, load in and disposal of the Gyda platform in the Norwegian part of the North Sea.
Views: 316
Innovation overhauled thumbnail image

Innovation overhauled

September 20 - DEME’s offshore installation vessel Innovation has undergone a major refit at Damen’s Verolme shipyard in Rotterdam.
Views: 362
Sun shines with Chipolbrok thumbnail image

Sun shines with Chipolbrok

September 20 - Chipolbrok has delivered a range of heavy and oversized components using its vessel Chipolbrok Sun, including 56 wind turbine tower sections in Piteå, Sweden.
Views: 313

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.