Latest news from Heavy Lift & Project Forwarding International Magazine

Haliade-X components on the move

A wind turbine blade from LM Wind Power, measuring 107 m long, has arrived at the port of Blyth in the UK for testing at Offshore Renewable Energy Catapult’s facilities.

 

The blade, designed to operate from GE’s Haliade-X 12 MW turbine, arrived at the port on board Symphony Shipping’s vessel Symphony Space.

Once at the test facility, the blade will undergo a range of testing procedures to study its ability to withstand peak wind conditions.

The Haliade-X nacelle, meanwhile, is on its way to Rotterdam, the Netherlands from Saint-Nazaire, France on board BigLift Shipping’s heavy lift vessel Happy Sky. A video of the loading in Saint-Nazaire can be seen here.

Three other 107 m blades will soon be shipped to the prototype site in Rotterdam.

According to GE, both the nacelle and blades will initially be installed onshore for testing, which will allow the company to collect the necessary data to obtain the type certificate – a key step in the commercialisation of the turbine.

www.bigliftshipping.com

portofblyth.co.uk

www.ge.com

ore.catapult.org.uk

www.symphonyshipping.nl

Heavy Lift | News

AAL ships super-yacht component  thumbnail image

AAL ships super-yacht component 

February 20 - AAL has transported an 85.3 m-long yacht hull from Humen, China to Henderson in Western Australia, on board the 19,000 dwt S-Class multipurpose vessel AAL Dampier.
Views: 277
Charter rates remain steady  thumbnail image

Charter rates remain steady 

February 18 - Time charter rates in the multipurpose shipping sector have remained steady over the last month, according to shipbroker Toepfer Transport. 
Views: 632

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.