Latest news from Heavy Lift & Project Forwarding International Magazine

Tuvia Italia handles exchanger shipment

Italy-headquartered Tuvia Italia has loaded a heat exchanger on to a heavy lift vessel at Monfalcone port.

Manufactured by Alfa Laval Olmi, the shipment included two main components. The heaviest of which weighed 775-tons (703.7-tonnes) and measured 42.50 m x 7.20 m x 6.25 m.

The second unit measured 19.58 m x 5.15 m x 5.67 m and weighed 211-tons (191.4 tonnes).

The components, plus additional equipment weighing approximately 600-tons (544.3-tonnes), were loaded onto SAL Heavy Lift’s vessel Hilke at Monfalcone port for transportation to Dalian, China.

Tuvia Italia is a member of the WCA Projects network.

www.tuviaitalia.com

sal-heavylift.com

www.wcaprojects.com

Heavy Lift | News

MIS moves engine across Oman thumbnail image

MIS moves engine across Oman

September 13 - Muscat International Shipping & Logistics (MIS) has transported a 140-ton (127-tonne) Wärtsilä engine from a power station in Khasab to Duqm, Oman.
Views: 475
Zeamarine picks Rhenus for Dutch calls thumbnail image

Zeamarine picks Rhenus for Dutch calls

September 11 - Rhenus Logistics has signed a contract with heavy lift shipping line Zeamarine for the provision of stevedoring and ship agency services at the port of Rotterdam.
Views: 1028

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.