Latest news from Heavy Lift & Project Forwarding International Magazine

Cosmatos on the double

Cosmatos Shipping Services has coordinated port handling and operations involved in the delivery of six refinery columns and 86 loose parts in Greece.

The shipment had a total volume of 1,500 cu m. The largest column measured 27 m x 2.5 m x 2.5 m and weighed 20 tons (18.2 tonnes).

The cargoes originated from Thessaloniki and were destined for Port Said in Egypt.

In a separate project, Cosmatos coordinated the discharge, storage and transportation of four wind turbines, with blades measuring 65 m in length, at Thessaloniki port.

Cosmatos is the Greek member of the Worldwide Project Consortium (WWPC).

www.cosmatosgroup.com

www.wwpc.eu.com

Heavy Lift | News

GPLN delegates convene in Bremen thumbnail image

GPLN delegates convene in Bremen

May 23 - More than 180 delegates of the Global Project Logistics Network (GPLN) convened at the Dorint Park Hotel in Bremen earlier this week for the group’s 16th annual meeting.
Views: 158
Big Carl arrives at Bristol Port thumbnail image

Big Carl arrives at Bristol Port

May 23 - Sarens’ SGC 250 crane is presently in storage at Bristol Port, UK ahead of its delivery to the Hinkley Point C nuclear power plant.
Views: 186
Liebherr delivers for Eurogruas thumbnail image

Liebherr delivers for Eurogruas

May 22 - Spanish crane rental and heavy lift service provider Eurogruas has taken delivery of an 800-tonne lifting capacity crawler crane from Liebherr.
Views: 340
Superior bridge service with Imperial thumbnail image

Superior bridge service with Imperial

May 22 - Imperial Crane Services and Superior Construction have utilised a Liebherr LR1300 SX crawler crane to lift six concrete beams for the Chase Street bridge replacement project in California, USA.
Views: 383

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.