September 1 - Seaway Heavy Lifting has installed the 555-tonne IKA JZ deck on top of the existing jacket for INAgip, a joint venture beween Croatia's oil company INA and Italy's Eni.

Seaway's crane vessel Oleg Strashnov lifted the deck into position, so that it could be welded to the four connecting legs.

The IKA JZ platform, which was constructed by Rosetti Marino and its Croatian subcontractor Viktor Lenac shipyard, is part of a wide gas field development in the Croatian sector of the Adriatic Sea.

 

 

www.seawayheavylifting.com.cy