ALS has transported five transformers with a total weight of 117 tonnes from Germany to St. Petersburg, Russia.

ALS-Transformers

The height of the transformers reached 4.6 m. ALS arranged lowbed trailers to move them to the nearest river port. A mobile crane was used for transhipment operations before the transformers made their way to Antwerp by barge.

ALS was responsible for arranging road surveys, civil works on the route, additional convoys and a police escort.

abnormal-loads.com