Latest news from Heavy Lift & Project Forwarding International Magazine

Egytrans deploys gantry system for power plant project

Egytrans has transported and lifted a 245-ton (222.3-tonne) turbine and 290-ton (263.1-tonne) generator for a power plant construction project in western Cairo, Egypt.

Both units had to be lifted to a height of 16 m, said Egytrans. They were then skidded along a 50 m track to reach their foundations using a strand jack gantry system from Enerpac.

The turbine and generator had to be rotated 90 degrees before Egytrans could move the units to their final positions.

Earlier this year, the company relocated its Cairo head office to Down Town Katameya Mall. Egytrans’ new location can be found here.

egytrans.com

Heavy Lift | News

Mammoet delivers first components for Saudi plant thumbnail image

Mammoet delivers first components for Saudi plant

September 16 - Samsung Engineering has contracted Mammoet to transport and install 49 modules for Jubail United Petrochemical’s ethylene oxide–ethylene glycol (EO/EG) plant in Saudi Arabia.
Views: 163
MIS moves engine across Oman thumbnail image

MIS moves engine across Oman

September 13 - Muscat International Shipping & Logistics (MIS) has transported a 140-ton (127-tonne) Wärtsilä engine from a power station in Khasab to Duqm, Oman.
Views: 590
CTO completes brewery shipment thumbnail image

CTO completes brewery shipment

September 12 - CTO do Brasil has coordinated the delivery of brewery equipment from the port of Nantong, China to the port of Santos, Brazil.
Views: 484

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.