Latest news from Heavy Lift & Project Forwarding International Magazine

Allseas wins Equinor contract

Equinor Energy selected Allseas for the removal, transfer, load-in and disposal of the 48,000-tonne Statfjord A platform topsides.

For the project, Allseas will deploy its installation and decommissioning vessel Pioneering Spirit, which will remove the topsides from the concrete gravity-based substructure in one piece sometime after 2022.

One of the largest platforms on the Norwegian continental shelf, Statfjord A stands in 149 m of water in the centre of the Statfjord field, located in the northern North Sea.

In total, the topsides measure 84 m long and 54 m wide.

Prior to the lifting operation, Allseas will increase the capacity of the vessel’s topsides lifting system (TLS) from the current 48,000 tonnes in order to take into account any weight deviations.

Allseas has selected Kvaerner to demolish the topsides at its Stord disposal facility on the west coast of Norway.

The topsides will be transferred from Pioneering Spirit to Allseas’ special-purpose barge Iron Lady for towage to the yard. The topsides will then be skidded onto the quay.

allseas.com

Heavy Lift | News

Volga-Dnepr to expand at Leipzig thumbnail image

Volga-Dnepr to expand at Leipzig

June 19 - Volga-Dnepr Group and Mitteldeutsche Flughafen (MFAG) have signed a memorandum of understanding (MoU) to expand their partnership at Leipzig/Halle Airport in Germany.
Views: 270
Jan De Nul lands Formosa 2 contract thumbnail image

Jan De Nul lands Formosa 2 contract

June 19 - Jan De Nul Group has been awarded an engineering, procurement, construction and installation (EPCI) contract for Taiwan’s Formosa 2 offshore wind farm.
Views: 239

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.